eReserve9 (Goodfare)

Battery Icon

STATUS:

Operational

COMMISSIONED:

December 2023

LOCATION:

Hythe, Alberta

TECHNOLOGY:

Lithium-Ion

CAPACITY:

20 MW / 35 MWh

eReserve9 is a 20 MW lithium-ion Battery Energy Storage Facility (BESF) located southwest of the community of Hythe in the County of Grand Prairie, Alberta. The facility supports the reliability of the AEIS to ensure consumers’ needs are met. It is located on privately owned and previously disturbed land directly south of the ATCO owned Goodfare 815S Substation.

“Maskwa High Voltage Ltd. (Maskwa) was successfully awarded the Engineering, and Environmental Planning & Permitting contract for Enfinite’s eReserve 7&8 (Wapiti 40MW) and eReserve 9 (Goodfare 20MW) Battery Energy Storage Site (BESS) projects. In collaboration with Enfinite, Maskwa worked closely with Valard, AESO and major equipment vendors, to address engineering, construction, and commissioning challenges by implementing solutions as a collaborative project team.”

– Maskwa High Voltage Ltd.

Site Contact

Head Office: (587) 747-4050
Email: info@enfinite.com