Hutchison Project

Battery Icon

STATUS:

In Development

COMMISSIONED:

Coming Soon

LOCATION:

17km NE of Medicine Hat, AB

TECHNOLOGY:

Lithium-Ion

CAPACITY:

100 MW

Project Description

Enfinite is planning to construct a 100 MW Battery Energy Storage Facility (BESF) and substation approximately 17 km northeast of Medicine Hat, Alberta. The facility will be located on a 10-acre portion of 160 acres of land and will be connected to the Alberta Interconnected Electric System through the AltaLink 244S Bowmanton substation through a new 240 kV transmission line.  

Proposed Location

Lat: 50.143897°

Long: -110.482969°

Cypress County:

Google Map Link

Facility Design:

Major Equipment:

The battery storage facility and substation expect to have the following major equipment (all subject to change throughout project design):

  • 105 – battery modules with inverters  
  • 27 – Medium Voltage (MV) transformers
  • Effective grounding equipment for the bus.
  • Fused disconnects to protect the downstream transformer.
  • 1 – 240 kV – Medium Voltage(MV) power transformer.
  • 1 – Medium Voltage (MV) bus along with circuit breakers, disconnects and station service transformer.
  • 240 kV bus hardware including circuit breaker and disconnects.
  • 240 kV and Medium Voltage(MV) potential transformers.
  • Oil containment for the power transformer.
  • A new control building to house protection and control systems for the new equipment in the substation as well as the BESS site.
  • 2 –  40 -foot storage containers and one prefabricated office trailer

Project News

Stay up to date on everything happening on this project by reading our latest newsletter!

FAQ

For more insight into our Frequently Asked Questions click the button below

Proposal Application Information

The application has not yet been submitted. The application is anticipated to be submitted in Spring of 2026 

What is the Project timeline?